Final | 11/6/2018 | 11/7/2018 | 11/7/2018 | A | PASS |
Eric Story
|
|
|
Home owner will be home Phone #: ###-#### Inspection requested via web by steve sellers EC is resposible for whole install of Solar Array system Final ok
|
Electrical Rough-In | 11/6/2018 | 11/7/2018 | 11/7/2018 | A | DONE |
Eric Story
|
|
|
Home owner will be home Phone #: ###-#### Inspection requested via web by steve sellers Already did rough-in ok to cover
|
Final | 11/6/2018 | 11/6/2018 | 11/6/2018 | A | CANC |
Eric Story
|
|
|
Call for access Phone #: ###-#### Inspection requested via web by steve sellers Solar contractor needs seperate permit to install panels, Verfied all listing and scope of work will need permit to proceed with a final inspection......
|