Final | 11/27/2018 | 11/28/2018 | 11/28/2018 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Craig Card signed and final ok
|
Electrical Rough-In | 11/26/2018 | 11/27/2018 | 11/27/2018 | A | CANC |
James Ady
|
|
|
Ceiling cover inspection. Removed existing grid fixtures and replaced with new LED fixtures Phone #: ###-#### >> Inspection requested via web by Steve Craig Inspection cancelled from web by: Steve Craig
|
Electrical Rough-In | 11/7/2018 | 11/7/2018 | 11/7/2018 | P | PASS |
Rock A. Hudson
|
|
|
Cover inspection in new walls Phone #: ###-#### Inspection requested via web by Steve Craig As per Daryl DeGrange existing service ok to remain as originally installed, CT meter on exterior with overhead service entrance conductors passing unfused through roof to 2 main breaker panels. 250.24- Grounded electrical systems shall have a grounding electrode system installed as described in 250.52. Wall rough in ok cover.
|