Final | 2/19/2019 | 2/20/2019 | 2/20/2019 | A | PASS |
Tom Saunders
|
|
|
Contact: Brian Gee Phone #: ###-#### Inspection requested via web by Deb Gooden... correction made...ok to final
|
Final | 2/15/2019 | 2/19/2019 | 2/19/2019 | A | FAIL |
Tom Saunders
|
|
|
Contact: Brian Gee Phone #: ###-#### Inspection requested via web by Deb Gooden... 1) all outlets in bedrooms shall have AFCI protection..upstairs bedrooms where rewire was done and all smoke detectors 2) plates on recps and switches shall be installed..multiple place thru out house
|
Electrical Rough-In | 11/30/2018 | 11/30/2018 | 11/30/2018 | P | PASS |
Mark Moncarr
|
|
|
Contact: Brian Gee ... Lock Box #4888 for entry Phone #: ###-#### Inspection requested via web by Deb Gooden Ok cover upstairs and ceiling downstairs.
|
Electrical Rough-In | 11/29/2018 | 11/30/2018 | 11/30/2018 | A | NH |
Tom Saunders
|
|
|
Contact: Jason Noble Phone #: ###-#### Inspection requested via web by Deb Gooden.. no access discussed with contractor fees need adjusted for work done...rough in of upstairs
|
Permanent Service | 11/16/2018 | 11/16/2018 | 11/16/2018 | P | PASS |
Tom Saunders
|
|
|
contact: Brian Gee Phone #: ###-#### Inspection requested via web by Deb Gooden.. upstairs circuits removed from panel because of fire, existing uffer ground p/s u/g reconnect ok...meter onsite
|