Electrical Rough-In | 2/24/2019 | 2/25/2019 | 2/25/2019 | A | PASS |
Mark Moncarr
|
|
|
need cover for kitchen walls and ceiling - countertop spacing for outlets Phone #: ###-#### Inspection requested via web by dennis mcneely Ok cover kitchen
|
Electrical Rough-In | 2/19/2019 | 2/19/2019 | 2/19/2019 | P | PASS |
Mark Moncarr
|
|
|
Need to insulate outside wall in kitchen area Phone #: ###-#### Inspection requested via web by dennis mcneely Ok cover exterior kitchen wall.
|
Electrical Rough-In | 2/11/2019 | 2/11/2019 | 2/11/2019 | P | PASS |
Mark Moncarr
|
|
|
cvr for 2nd flr bathroom needed Phone #: ###-#### Inspection requested via web by dennis mcneely Ok cover up bath
|
Electrical Rough-In | 1/31/2019 | 2/1/2019 | 2/1/2019 | A | PASS |
Mark Moncarr
|
|
|
need cvr on 2nd flr masterbath bedroom and floor patching -1st flr living area den and den bath room Phone #: ###-#### Inspection requested via web by dennis mcneely Ok cover up mstr bed/bath, hall and down living/den. 1 outlets needs added in smoking room to left of door, and 1 outlet on column to right of fireplace in living now that wall is open. Will need to see on final inspection.
|
Electrical Rough-In | 12/10/2018 | 12/10/2018 | 12/10/2018 | P | PASS |
Mark Moncarr
|
|
|
need ok for floor cover master bath 2nd floor Phone #: ###-#### Inspection requested via web by dennis mcneely Ok cover floor up mstr bath.
|
Conference | 11/27/2018 | 11/27/2018 | 11/27/2018 | P | PASS |
Mark Moncarr
|
|
|
got a conduit in the floor and would like to go over installation with u Phone #: ###-#### Inspection requested via web by dennis mcneely Conference on grd work in basement.
|