Final | 6/18/2020 | 6/22/2020 | 6/22/2020 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Greg Idsinga final ok
|
Electrical Rough-In | 1/21/2019 | 1/22/2019 | 1/22/2019 | P | PASS |
James Ady
|
|
|
Tile floor heat Phone #: ###-#### Inspection requested via web by Greg Idsinga Master bath floor heat only ok to cover
|
Electrical Rough-In | 11/19/2018 | 11/19/2018 | 11/19/2018 | P | PASS |
James Ady
|
|
|
Remodel Phone #: ###-#### Inspection requested via web by Greg Idsinga Main leve and Basement stair lights only ok to cover
|