Final | 1/8/2019 | 1/9/2019 | 1/9/2019 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Same Electric Ok final. Overhead to underground for hot tub. Hot tub GFI functions properly.
|
Permanent Service | 12/20/2018 | 12/21/2018 | 12/21/2018 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Same Electric Service was reconnected after hours. changed from overhead to underground. Grounding is complete. p/s u/g n ok
|
Electrical Rough-In | 12/19/2018 | 12/20/2018 | 12/20/2018 | A | PASS |
Mark Moncarr
|
|
|
Needs OK to cover Phone #: ###-#### Inspection requested via web by Same Electric Ok cover trench for new underground feed. Depth meets code requirements.
|
Final | 12/6/2018 | 12/7/2018 | 12/7/2018 | A | FAIL |
Mark Moncarr
|
|
|
###-####-Please call when on the way Phone #: ###-#### Inspection requested via web by Same Electric Table 680.9(A) requires an overhead service line not enclosed in conduit, to be a minimum of 10' horizontally outside the inside walls of a hottub or pool. If not, a height of 22.5' or more must be maintained from the top of the water line. In order for a final inspection, hottub location would need to changed, and a load calculation will need to be done as it is fed from a 90a main brkr.
|