Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberELE18-04477
StatusFinaled
Name ENERGY ENTERPRISE GROUP LLC
Site Address 3101 N SYCAMORE DR
Project Name 
Customer Number718
ePlanReviewNo
Description
Alteration: Electrical for construction of new fire station
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final4/27/20204/27/20204/27/2020PPASS
DetailsMark Moncarr
Partial final was completed in October 2019. Building is occupied. Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok final. Commisioning report was reviewed and is with the City of Boise.
Final3/19/20203/19/20203/19/2020PCANC
DetailsMark Moncarr
We would like a 30-minute or more call ahead. We have a separate electrical permit for the solar that we will be asking for a consult at the same time. My contact number is ###-#### and my name is Graham Phone #: ###-#### Inspection requested via web by Kerri Hamilton Talked to Graham, he is going to check into the commissioning report. Once report is turned into the city then I will be notified when it is approved for final.
Electrical Rough-In10/16/201910/16/201910/16/2019PDONE
DetailsMark Moncarr
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Seperate building permit needs pulled, and solar permit. Original bld permit does not have any documentation for a solar installation.
Conference10/14/201910/14/201910/14/2019PDONE
DetailsMark Moncarr
As early as possible would be appreciated! Thanks, Phone #: ###-#### Inspection requested via web by Kerri Hamilton Discussed GEC system for solar install on top of building. Solare does not supply building attached too.
Final10/7/201910/8/201910/8/2019APART
DetailsMark Moncarr
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Waiting for remainder of solar install. (per Phone Call per Mark Moncarr ok for TCO )
Electrical Rough-In8/30/20199/3/20199/3/2019APASS
DetailsMark Moncarr
Dan is our site contact. A 30 minute call ahead is appreciated if possible. We are looking for an above grid ceiling rough-in inspection Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok cover ceilings throughout.
Permanent Service7/22/20197/23/20197/23/2019APASS
DetailsMark Moncarr
Phone #: ###-#### Inspection requested via web by Kerri Hamilton p/s u/g n ok
Electrical Rough-In6/26/20196/27/20196/27/2019PPASS
DetailsMark Moncarr
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok cover trench NW corner
Electrical Rough-In6/20/20196/21/20196/21/2019APASS
DetailsMark Moncarr
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok cover hardlids in 6 bathrooms.
Electrical Rough-In5/20/20195/20/20195/20/2019PPASS
DetailsMark Moncarr
Please call 30 minutes ahead if possible. Contact is Dan at ###-#### Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok cover walls throughout.
Electrical Rough-In1/17/20191/17/20191/17/2019PPASS
DetailsMark Moncarr
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok cover conduits throughout.
Electrical Rough-In1/9/20191/10/20191/10/2019APASS
DetailsTom Saunders
Underground Phone #: ###-#### Inspection requested via web by Kerri Hamilton...

main feeds under foundation and electrical rm ok to cover
Electrical Rough-In11/28/201811/28/201811/28/2018PPASS
DetailsMark Moncarr
This is a ufer ground inspection. If you can call 30 minutes ahead, it will be greatly appreciated. thank you. Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok cover ufer N side of building.