Final | 4/27/2020 | 4/27/2020 | 4/27/2020 | P | PASS |
Mark Moncarr
|
|
|
Partial final was completed in October 2019. Building is occupied. Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok final. Commisioning report was reviewed and is with the City of Boise.
|
Final | 3/19/2020 | 3/19/2020 | 3/19/2020 | P | CANC |
Mark Moncarr
|
|
|
We would like a 30-minute or more call ahead. We have a separate electrical permit for the solar that we will be asking for a consult at the same time. My contact number is ###-#### and my name is Graham Phone #: ###-#### Inspection requested via web by Kerri Hamilton Talked to Graham, he is going to check into the commissioning report. Once report is turned into the city then I will be notified when it is approved for final.
|
Electrical Rough-In | 10/16/2019 | 10/16/2019 | 10/16/2019 | P | DONE |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Seperate building permit needs pulled, and solar permit. Original bld permit does not have any documentation for a solar installation.
|
Conference | 10/14/2019 | 10/14/2019 | 10/14/2019 | P | DONE |
Mark Moncarr
|
|
|
As early as possible would be appreciated! Thanks, Phone #: ###-#### Inspection requested via web by Kerri Hamilton Discussed GEC system for solar install on top of building. Solare does not supply building attached too.
|
Final | 10/7/2019 | 10/8/2019 | 10/8/2019 | A | PART |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Waiting for remainder of solar install. (per Phone Call per Mark Moncarr ok for TCO )
|
Electrical Rough-In | 8/30/2019 | 9/3/2019 | 9/3/2019 | A | PASS |
Mark Moncarr
|
|
|
Dan is our site contact. A 30 minute call ahead is appreciated if possible. We are looking for an above grid ceiling rough-in inspection Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok cover ceilings throughout.
|
Permanent Service | 7/22/2019 | 7/23/2019 | 7/23/2019 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton p/s u/g n ok
|
Electrical Rough-In | 6/26/2019 | 6/27/2019 | 6/27/2019 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok cover trench NW corner
|
Electrical Rough-In | 6/20/2019 | 6/21/2019 | 6/21/2019 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok cover hardlids in 6 bathrooms.
|
Electrical Rough-In | 5/20/2019 | 5/20/2019 | 5/20/2019 | P | PASS |
Mark Moncarr
|
|
|
Please call 30 minutes ahead if possible. Contact is Dan at ###-#### Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok cover walls throughout.
|
Electrical Rough-In | 1/17/2019 | 1/17/2019 | 1/17/2019 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok cover conduits throughout.
|
Electrical Rough-In | 1/9/2019 | 1/10/2019 | 1/10/2019 | A | PASS |
Tom Saunders
|
|
|
Underground Phone #: ###-#### Inspection requested via web by Kerri Hamilton...
main feeds under foundation and electrical rm ok to cover
|
Electrical Rough-In | 11/28/2018 | 11/28/2018 | 11/28/2018 | P | PASS |
Mark Moncarr
|
|
|
This is a ufer ground inspection. If you can call 30 minutes ahead, it will be greatly appreciated. thank you. Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok cover ufer N side of building.
|