Final | 12/28/2018 | 12/28/2018 | 12/28/2018 | P | PASS |
Tom Saunders
|
|
|
A.M. is fine as well. Please call 20 min pervious. Thanks Phone #: ###-#### Inspection requested via web by Kevin Burke... ok to final
|
Final | 12/24/2018 | 12/24/2018 | 12/24/2018 | P | NR |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Burke... not ready at this time...contractor has been unable to finish work...tenant said was ready
|
Final | 12/24/2018 | 12/24/2018 | 12/24/2018 | P | CANC |
Tom Saunders
|
|
|
Matt-this is the tenant-can''t get a hold of the electrical to call inspection Phone #: ###-####.... permit holder is required to schedule inspections inspection was scheduled by building owner/tennant
|
Final | 11/26/2018 | 11/26/2018 | 11/26/2018 | P | CANC |
Tom Saunders
|
|
|
Please call 20 minutes prior so that I can have it unlocked. Phone #: ###-#### Inspection requested via web by Kevin Burke... changed to rough inspection instead...not ready for final at this time
|
Electrical Rough-In | 11/26/2018 | 11/26/2018 | 11/26/2018 | P | PASS |
Tom Saunders
|
|
|
Please call 20 minutes prior so that I can have it unlocked. Phone #: ###-#### Inspection requested via web by Kevin Burke... rough in for new sub panel fed from existing meter pac...100A panel added will schedule final once all equipment is installed and wired...verify panel labelling inside and at meter pac
|