Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberELE18-04519
StatusFinaled
Name KC ENTERPRISES
Site Address 2004 N HARRISON BLVD
Project Name 
Customer Number 
ePlanReviewNo
Description
Addition: Demo & remove existing electrical in back of home. Install new sub panel in the basement. Install new 200 amp overhead meter / main panel on the side of the home. Provide electrical rough in and trim in the new remodel and addition.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final2/13/20192/13/20192/13/2019APASS
DetailsMark Moncarr
Addition is ready for final. You can enter through back door, building will be open , other trades will be in and out. Panel is labeled, all power is on, smoke detectors installed. GFCI installed in bathrooms, GFCI 2 pole 15 amp breakers installed for floor heat. Arc fault installed for the bedroom and smoke detectors. Overhead Exterior Panel located on north side of home. Phone #: ###-#### Inspection requested via web by Kurt Carlson Ok final. Box down low in cabinets in utility needed moved out to be flush with inside back of cabinet. Electrician completed.
Electrical Rough-In1/21/20191/22/20191/22/2019APASS
DetailsMark Moncarr
Electric floor heat pads have been installed, these may need to be inspected. Thermostats boxes and conduits are installed, wiring for floor pads has been pulled to the thermostat boxes. Phone #: ###-#### Inspection requested via web by Kurt Carlson Ok cover flr heat main level E side of house.
Electrical Rough-In12/19/201812/20/201812/20/2018APASS
DetailsMark Moncarr
Walls and ceiling are ready for inspection. New home runs installed from new panel, smurf tube installed from t-stat location down to floor for floor heat pads. Some existing nob ; tube was installed into new boxes and connected to new circuits. Phone #: ###-#### Inspection requested via web by Kurt Carlson Ok cover addition to back of house.
Rough-In Permanent Service12/13/201812/14/201812/14/2018PPASS
DetailsMark Moncarr
Idaho power is dropping the overhead service to the existing 125 amp service, we will be removing old service and installing new 200 amp overhead service. New addition will be ready for rough in inspection also. This should be ready by 1:00 PM ish. Phone #: ###-#### Inspection requested via web by Kurt Carlson p/s o/h n ok
Rough-In Permanent Service12/11/201812/12/201812/12/2018PCANC
DetailsMark Moncarr
Addition will be ready for rough in inspection. Idaho Power will be shutting power off, dropping overhead service line, we will change out existing service to new 200 amp service, we will need inspection around 1:30 ish. Phone #: ###-#### Inspection requested via web by Kurt Carlson Talked to Kurt. Job not supposed to be inspected until Fri the 12/14