Final | 1/4/2019 | 1/4/2019 | 1/4/2019 | P | PASS |
Rock A. Hudson
|
|
|
JR. Phone #: ###-#### Inspection requested via web by Sean DeLacy Final ok
|
Final | 1/2/2019 | 1/2/2019 | 1/2/2019 | P | FAIL |
Rock A. Hudson
|
|
|
JR. Phone #: ###-#### Inspection requested via web by Sean DeLacy IECC 405 2- Lighting controls mandatory. Occupancy sensor or manual control to reduce lighting output by 50% required. NEC 110.3- Unable to locate emergency ballast luminaires as noted on print. 400.12 (2) and (5)- Flexible cords shall not be run through suspended ceilings or be run above suspended ceilings.
|
Electrical Rough-In | 12/27/2018 | 12/27/2018 | 12/27/2018 | P | PASS |
Rock A. Hudson
|
|
|
JR. Ceiling cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy Grid rough in ok cover
|
Electrical Rough-In | 12/4/2018 | 12/5/2018 | 12/5/2018 | A | PASS |
Rock A. Hudson
|
|
|
JR. Wall cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy Ofiice located thru south double door near south end of building. Wall rough in ok cover.
|