Final | 2/21/2019 | 2/22/2019 | 2/22/2019 | A | PASS |
James Ady
|
|
|
Contact Toby Davis Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Final ok
|
Final | 1/18/2019 | 1/18/2019 | 1/18/2019 | P | PART |
James Ady
|
|
|
Please call Toby for final inspection of servery area. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo 210.8B All receps 150V to ground or less 50A or less shall be GFCI protected. (Servery Drop cords)
|
Electrical Rough-In | 12/26/2018 | 12/26/2018 | 12/26/2018 | P | PASS |
Eric Story
|
|
|
Please call Toby for wall R/I inspection at servery. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Walls and ceiling inn cafeteria hard lids are ok to cover
|
Electrical Rough-In | 12/11/2018 | 12/12/2018 | 12/12/2018 | A | PASS |
James Ady
|
|
|
Please call Toby for underground inspection at servery. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Servery only underground ok to cover
|