Final | 2/14/2019 | 2/20/2019 | 2/20/2019 | A | PASS |
Tom Saunders
|
|
|
We have left plans on site in the meter box Phone #: ###-#### Inspection requested via web by Brecklee Brown... labelling, disconnect, and OCPD ok
|
Permanent Service | 2/19/2019 | 2/19/2019 | 2/19/2019 | P | PASS |
Tom Saunders
|
|
|
service change... p/s o/h reconnect ok
|
Electrical Rough-In | 2/14/2019 | 2/19/2019 | 2/19/2019 | P | PASS |
Tom Saunders
|
|
|
We need a power to panel inspection for a meter upgrade in order to get the power restored by Idaho Power. Brian McEwen will be on site and can be reached at ###-####. We would like for a 1PM inspection if possible. We also need a rough inspection as well. So two different inspections. Phone #: ###-#### Inspection requested via web by Brecklee Brown... UL listed equipment verified
|