Final | 8/5/2019 | 8/5/2019 | 8/5/2019 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Neal Rumsey Corrections made final ok
|
Final | 6/20/2019 | 6/20/2019 | 6/20/2019 | A | FAIL |
Rock A. Hudson
|
|
|
It will be open Phone #: ###-#### Inspection requested via web by Neal Rumsey 110.27- All exposed NM calbe shall be protected from contact. Repair office wall. Provide clearance from fireplace with low voltage cables. Cable against flue. 210.70- All code required lighting outlets shall be operational. Stair 3 ways, out door with grade level access, All 3 ways in-op, check all outdoor lighting,
|
Rough-In Permanent Service | 12/10/2018 | 12/11/2018 | 12/11/2018 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Neal Rumsey rough in ok p/s u/g n ok
|