Final | 2/18/2019 | 2/19/2019 | 2/19/2019 | A | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Sherry Allen... ok to final
|
Final | 1/18/2019 | 1/22/2019 | 1/22/2019 | A | FAIL |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Krista Ratterree... meter must be installed and power on before final can be scheduled and inspected
|
Rough-In Permanent Service | 1/18/2019 | 1/18/2019 | 1/18/2019 | P | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Krista Ratterree.... service switch gear and grounding installed by others underground and wire feeds done by contractor p/s u/g new ok
|
Final | 1/17/2019 | 1/18/2019 | 1/18/2019 | A | FAIL |
Tom Saunders
|
|
|
Rhonda Phone #: ###-####... no rough inspection was performed on service or work...unable to verify grounding at service, generator, and transformer...AFC label needs applied to service...a rough permanent service inspection is required before a final can be scheduled
|
Conference | 12/11/2018 | 12/12/2018 | 12/12/2018 | A | CANC |
Tom Saunders
|
|
|
This is for an underground inspection, I did not see that option in choices, Dustin is point of contact on this inspection, Thank you Phone #: ###-#### Inspection requested via web by Krista Ratterree...
just needed to schedule as rough inspection instead of conference...scheduled and resulted
|
Electrical Rough-In | 12/12/2018 | 12/12/2018 | 12/12/2018 | A | PASS |
Tom Saunders
|
|
|
This is for an underground inspection, I did not see that option in choices, Dustin is point of contact on this inspection, Thank you Phone #: ###-#### Inspection requested via web by Krista Ratterree... underground ok to cover
|