Final | 2/27/2019 | 3/4/2019 | 3/4/2019 | P | PASS |
Mark Moncarr
|
|
|
Final for electrical remodel project. Phone #: ###-#### Inspection requested via web by Kevin Perez Ok final.
|
Electrical Rough-In | 12/12/2018 | 12/13/2018 | 12/13/2018 | A | PASS |
Mark Moncarr
|
|
|
Electrical Rough-in for walls and ceiling spaces needing insulation. Phone #: ###-#### Inspection requested via web by Kevin Perez Ok cover kitchen, down and up bath. Misc cans throughout.
|