Final | 6/14/2019 | 6/17/2019 | 6/17/2019 | A | PASS |
Tom Saunders
|
|
|
Key is in the carport at the stack of lumber. Look underneath the board on top. Phone #: ###-#### Inspection requested via web by Troy Cobb... ok to final
|
Permanent Service | 5/14/2019 | 5/14/2019 | 5/14/2019 | P | PASS |
Eric Story
|
|
|
No trenching was done, underground conduit was pulled in by same company that does that for Idaho Power all the time. We connected the 2 ends, and pulled in the wire. Phone #: ###-#### Inspection requested via web by Troy Cobb p/s o/h n ok
|
Electrical Rough-In | 12/21/2018 | 12/24/2018 | 12/24/2018 | A | PASS |
Tom Saunders
|
|
|
As discussed on the phone, the building is only set up for generator power for now. We will be bringing utility power to it at a later date. Just need a rough-in for now, then we will keep the permit open and schedule a final later. The shop is in the back of the property where the trucks are parked. Key is on the back post of the carport near the shop Phone #: ###-#### Inspection requested via web by Troy Cobb... rough ok to cover grounding of service will be changed by final... 2 ground rods if main service or 1 suplimental ground rod if fed from remote service
|