Final | 2/6/2019 | 2/6/2019 | 2/6/2019 | P | PASS |
James Ady
|
|
|
Nate Phone #: ###-#### Final ok
|
Final | 2/5/2019 | 2/6/2019 | 2/6/2019 | A | FAIL |
James Ady
|
|
|
Builder will be on site around 8:30. Call with any questions. Thanks. Phone #: ###-#### Inspection requested via web by Dylan Pierce 334. NM cable shall not be exposed too physical damage.( Where horizontal, run of NM cable in garage shall be cover and protected from damage)
|
Rough-In Permanent Service | 1/10/2019 | 1/11/2019 | 1/11/2019 | P | CANC |
James Ady
|
|
|
We are swapping power from old meter in garage to new outside meter. I should be done by 11:30. Early as possible after that would be great so i can have idaho power restore power. Thanks. Phone #: ###-#### Inspection requested via web by Dylan Pierce
|
Electrical Rough-In | 1/11/2019 | 1/11/2019 | 1/11/2019 | P | PASS |
James Ady
|
|
|
We are swapping power from old meter in garage to new outside meter. I should be done by 11:30. Early as possible after that would be great so i can have idaho power restore power. Thanks. Phone #: ###-#### Inspection requested via web by Dylan Pierce THHN removed garage ok to cover
|
Rough-In Permanent Service | 12/19/2018 | 12/20/2018 | 12/20/2018 | A | PASS |
Eric Story
|
|
|
Need to have inspection complete to schedule idaho power for power swap. Phone #: ###-#### Inspection requested via web by Dylan Pierce addition ok to cover of garage and other rooms(will clone a fail for above panel to insure THHN conductors are placed in a raceway) p/s u/g n ok
|
Electrical Rough-In | 12/20/2018 | 12/20/2018 | 12/20/2018 | P | FAIL |
Eric Story
|
|
|
Need to have inspection complete to schedule idaho power for power swap. Phone #: ###-#### Inspection requested via web by Dylan Pierce Space above panel has free ran THHN conductors not in a raceway and will need to be refeed or placed in a listed raceway before cover ....
|