Final | 3/20/2019 | 3/21/2019 | 3/21/2019 | A | PASS |
Rock A. Hudson
|
|
|
call 30 minutes before so we can make sure we have access to the room. Phone #: ###-#### Inspection requested via web by Jim Noll Final ok
|
Electrical Rough-In | 12/21/2018 | 12/21/2018 | 12/21/2018 | A | PASS |
Rock A. Hudson
|
|
|
please call me a half hour before on site to help with finding the room in the building. Phone #: ###-#### Inspection requested via web by Jim Noll This permit for TI space level 3. 5 floor boxes and repair damaged wall rough in ok cover
|