Final | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | PASS |
Tom Saunders
|
|
|
labelling, fused disconnect, and OCPD ok line side tap in panel ok to final
|
Final | 1/10/2019 | 1/10/2019 | 1/10/2019 | P | FAIL |
Tom Saunders
|
|
|
Please contact Keith with any questions
Thank you ; have a nice day! Phone #: ###-#### Inspection requested via web by JENNY EMEL
As per Boise City ordinance a rough inspection is required to be scheduled before final on all solar installations. All equipment on rough needs removed and inspected for UL listing. This is not the first solar install in the City of Boise for electrical contractor and solar contractor Old Dominion.
|