Final | 9/17/2019 | 9/17/2019 | 9/17/2019 | P | PASS |
Eric Story
|
|
|
Call ahead // Gemma Phone #: ###-#### Final ok
|
Final | 9/16/2019 | 9/16/2019 | 9/16/2019 | P | FAIL |
Eric Story
|
|
|
call for acess- Gemma Phone #: ###-#### Light fixtures need supported on boxes not hanging by wire nuts
|
Final | 3/21/2019 | 3/21/2019 | 3/21/2019 | P | CANC |
Eric Story
|
|
|
please call Robert for access Phone #: ###-#### Not ready
|
Electrical Rough-In | 1/24/2019 | 1/24/2019 | 1/24/2019 | P | PASS |
Eric Story
|
|
|
Call ahead 10 minutes // Robert Phone #: ###-#### Remaining rough-in ok to cover
|
Electrical Rough-In | 1/7/2019 | 1/8/2019 | 1/8/2019 | A | PASS |
Eric Story
|
|
|
Robert-partial inspection -please call when on way-he wants to be there for the inspection Phone #: ###-#### Ok to cover downstairs exterior wall and upstaires also ok to cover
|
Conference | 12/27/2018 | 12/28/2018 | 12/28/2018 | A | DONE |
Eric Story
|
|
|
call 15 mins ahead- Robert Phone #: ###-#### Discussed wiring addition being done in stages due to funds, owner seems to know exactly what is needed to wire all circuits
|