Final | 8/22/2019 | 8/22/2019 | 8/22/2019 | P | PASS |
Tom Saunders
|
|
|
All new electrical gear is installed, equipment is connected and in operation. Call with any questions. Kurt ###-#### Phone #: ###-#### Inspection requested via web by Kurt Carlson...labelling of breakers, AFI label, and new feeds into/out existing and new panel complete
|
Permanent Service | 1/10/2019 | 1/14/2019 | 1/14/2019 | P | PASS |
Rock A. Hudson
|
|
|
Idaho Power is replacing transformer, they are shutting power off to the building about 8:30 AM we will be removing old gear and installing new service gear and equipment. Should be ready for inspection about 1:30 PM Phone #: ###-#### Inspection requested via web by Kurt Carlson Main breaker panel board located in warehouse about 1/2 way down office wall towards east. New CT meter set on transformer on east side of building. Grounding electrode system, metal underground water pipe, ground rod and building steel. Unable to locate available fault current at time of inspection but verbally stated 10k below 50k rated main at 240 volt with 208 volt service. Will email AFC value to me as soon as located. p/s u/g rec ok
|