Final | 1/31/2019 | 1/31/2019 | 1/31/2019 | P | PASS |
James Ady
|
|
|
ready for final; approved plans on site; call customer ahead of time for access to the garage; or call me so that I can arrange it, at 850.8965 Thanks guys Phone #: ###-#### Inspection requested via web by Ryan King Final ok
|
Final | 1/31/2019 | 1/31/2019 | 1/31/2019 | P | CANC |
James Ady
|
|
|
final inspection with approved plans on site Phone #: ###-#### >> Inspection requested via web by Ryan King Inspection cancelled from web by: Ryan King
|
Electrical Rough-In | 1/28/2019 | 1/28/2019 | 1/28/2019 | P | PASS |
James Ady
|
|
|
solar panel and equipment listing inspection. The roof top crew will be there from 9 till 1 Phone #: ###-#### Inspection requested via web by Ryan King listing only ok
|