Final | 1/25/2019 | 2/1/2019 | 2/1/2019 | A | PASS |
James Ady
|
|
|
Plans left in meter box, customer will be home for inspection Phone #: ###-#### Inspection requested via web by Brecklee Brown Final ok
|
Final | 1/22/2019 | 1/24/2019 | 1/23/2019 | A | CANC |
Eric Story
|
|
|
Plans have been left on site in meter box Phone #: ###-#### >> Inspection requested via web by Brecklee Brown Inspection cancelled from web by: Brecklee Brown
|
Rough-In Permanent Service | 1/15/2019 | 1/17/2019 | 1/17/2019 | P | PASS |
Eric Story
|
|
|
We are doing a meter upgrade and need an inspection for Idaho Power to turn the power back on around 1PM. I was not sure what you called this inspection, many jurisdictions call it a power to panel but I did not see that option. Please call Brian when you are on your way ###-#### Phone #: ###-#### Inspection requested via web by Ashley White Solar power install for service will need all main grounding elewctrodes installed at new main disc and isolate grounds and neutrals at panel... p/s o/h rec ok
|
Final | 1/15/2019 | 1/18/2019 | 1/17/2019 | A | CANC |
Eric Story
|
|
|
Plans have been left on site in the meter box Phone #: ###-#### >> Inspection requested via web by Ashley White Inspection cancelled from web by: Brecklee Brown
|
Electrical Rough-In | 1/15/2019 | 1/16/2019 | 1/16/2019 | P | PASS |
Eric Story
|
|
|
Please call Brian when you are on your way ###-#### Phone #: ###-#### Inspection requested via web by Ashley White Solar Array parts listed and ok to install
|