Final | 5/3/2019 | 5/3/2019 | 5/3/2019 | P | PASS |
James Ady
|
|
|
Install 1 wall sign reading Peterbuilt on paint booth building. Phone #: ###-#### Inspection requested via web by Ken Olsen Final ok
|
Electrical Rough-In | 5/1/2019 | 5/2/2019 | 5/2/2019 | A | PASS |
James Ady
|
|
|
Request 9:30 inspection time. Install 1 wall sign Phone #: ###-#### Inspection requested via web by Ken Olsen Disc and listing ok
|