Final | 2/27/2019 | 2/28/2019 | 2/28/2019 | A | PASS |
Eric Story
|
|
|
solar install ready for inspection; approved plans on site; all work done according to the stamped plans; except for the taps inside the electrical panel, all work is surface/exterior. The solar equipment and meter are in the back yard directly under the array. Call me at 850.8965 before you head to the site, and I''ll arrange someone to be there to get you access inside/back yard. thanks guys Phone #: ###-#### Inspection requested via web by Ryan King Solar Array final ok
|
Electrical Rough-In | 2/6/2019 | 2/6/2019 | 2/6/2019 | P | PASS |
Eric Story
|
|
|
solar equipment listing inspection; the crew will be there from noon to 4; you can call me whenever your heading over to make sure they are there, depending on what time you have them on your schedule. Thanks guys, Ryan King 850.8965 Phone #: ###-#### Inspection requested via web by Ryan King Verifeid U/L listing of solar array system nad scope of work
|