Final | 2/4/2019 | 2/5/2019 | 2/5/2019 | A | PASS |
Eric Story
|
|
|
Solutions have been made. I think we will be ready for final about 11:30am Phone #: ###-#### Inspection requested via web by Dylan Pierce Overhead conductors re-ran to make clearences for hot tub. Final ok
|
Permanent Service | 2/5/2019 | 2/5/2019 | 2/5/2019 | P | PASS |
Eric Story
|
|
|
Solutions have been made. I think we will be ready for final about 11:30am Phone #: ###-#### Inspection requested via web by Dylan Pierce p/s o/h rec ok
|
Conference | 1/30/2019 | 1/30/2019 | 1/30/2019 | P | DONE |
Eric Story
|
|
|
Discussed the options of service change requirements over a hot tub. Tub is in-op at this time, option given of a structure over tub looks as if that is going to be the final correction. Owner will have it built i a timely manner.....
|
Permanent Service | 1/27/2019 | 1/29/2019 | 1/29/2019 | P | PASS |
Eric Story
|
|
|
Need to get a reconnect after service upgrade. Can we schedule for mid afternoon if possible. Phone #: ###-#### Inspection requested via web by Dylan Pierce p/s o/h rec ok Overhead lines will be addressed for final as they are within 10 of waters edge of hot tub but ok to re-energize as long as pool uis not in-use
|