Electrical Rough-In | 1/26/2019 | 1/28/2019 | 1/28/2019 | A | PASS |
Eric Story
|
|
|
strange job, i''m the 3rd electrical contractor. But, all I did was the 2nd story addition. All other wiring on 1st floor????? not mine... House is unoccupied. I will go early and unlock so you can do at your convenience Phone #: ###-#### Inspection requested via web by Andy Derrick 2nd floor only at this time(downstairs all fished in but wired from another contractor) will need a certified individual take over downstairs for safety reasons..... Ok to cover upstairs
|