Final | 3/11/2019 | 3/12/2019 | 3/12/2019 | A | PASS |
James Ady
|
|
|
Templeton real estate. Bown crossing area. Not open till nine am. Scope of work is in break room in the rear area. New circuit for microwave. New 30 amp 120 V circuit for water heater behind bar fridge. Half inch flex is strapped in ceiling with Tyraps to Perlins. Ceiling is 10 foot let me know in advance if you need me there please. Thanks Phone #: ###-#### Inspection requested via web by Rex Boyles Final ok
|
Electrical Rough-In | 3/12/2019 | 3/12/2019 | 3/12/2019 | P | PASS |
James Ady
|
|
|
Templeton real estate. Bown crossing area. Not open till nine am. Scope of work is in break room in the rear area. New circuit for microwave. New 30 amp 120 V circuit for water heater behind bar fridge. Half inch flex is strapped in ceiling with Tyraps to Perlins. Ceiling is 10 foot let me know in advance if you need me there please. Thanks Phone #: ###-#### Inspection requested via web by Rex Boyles rough in ok
|