Final | 2/27/2019 | 2/27/2019 | 2/27/2019 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Dean Gernaat final ok
|
Electrical Rough-In | 2/11/2019 | 2/12/2019 | 2/12/2019 | A | PASS |
Eric Story
|
|
|
walls and grid inspection. Suite 400, go through door to right of main suite entrance, follow plastic on carpet. Phone #: ###-#### Inspection requested via web by Dean Gernaat Walls and ceiling only ok to cover
|