Final | 4/11/2019 | 4/12/2019 | 4/12/2019 | P | FAIL |
Mark Moncarr
|
|
|
Frank Phone #: ###-#### 1. Junction box above range needs to be accessible after sheetrocked install. 2. 2 ground rods needed for newly added panel in bedroom. IDP meter tab was cut and meter was removed for new panel install. 3. Under cabinet lighting switchlegs need protected, or flourescent moved to allow wire to be completely inside wall. 4. All areas where work was performed was sheetrocked and had no rough in inspection. There areas need all sheetrock removed, or contact an electrical contractor to pull a seperate permit and assume responsiblity for work that was done. 5. Was not able to see all areas, as appliances were installed. May or may not be more corrections that need to be addressed. 6. An additional $55 needs paid to cover new panel install.
|