Final | 3/18/2019 | 3/20/2019 | 3/20/2019 | A | PASS |
Eric Story
|
|
|
Frederick Jones Phone #: ###-#### Inspection requested via web by BRS Permitting Final ok
|
Final | 3/18/2019 | 3/19/2019 | 3/18/2019 | A | CANC |
Eric Story
|
|
|
If anything comes up please call Kyle Phone #: ###-#### >> Inspection requested via web by BRS Permitting Inspection cancelled from web by: BRS Permitting
|
Final | 2/25/2019 | 3/4/2019 | 3/4/2019 | A | FAIL |
Rock A. Hudson
|
|
|
See also: BLD19-00303 Blue Raven Install Manager: Brian Prussia ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting No issues found with solar installation. BCC 4-05-32 No code violationg to be retained. 110.11- Materials installed outdoors shall be rated for outdoors. 110.12- Materials shall not be damaged. NM cable runs exposed on back of dwelling to AC unit has sun exposure damage. 334.12- NM cable shall not be installed in a wet location, shall not be installed in direct sunlight.
25 day notice to have corrected. Dircuit to AC unit shows damage from exposure. Replace with an approved wiring method.
|
Electrical Rough-In | 2/26/2019 | 2/27/2019 | 2/27/2019 | A | PASS |
Eric Story
|
|
|
Contact: Brian Prussia ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting Verified U/L listing and scope of work for solar array install
|