Final | 8/14/2019 | 8/14/2019 | 8/14/2019 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Clinton Warren Ok final. All recepts TR, and floor heat GFI functions properly
|
Electrical Rough-In | 3/25/2019 | 3/25/2019 | 3/25/2019 | P | PASS |
Mark Moncarr
|
|
|
I did not see the option in the drop down list, but I need an inspection for the radiant floor heating. Phone #: ###-#### Inspection requested via web by Clinton Warren Ok cover floor heat.
|
Conference | 2/28/2019 | 3/1/2019 | 3/1/2019 | A | DONE |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Clinton Warren Discussed 20a for bath GFI, and dedicated for floor heat.
|