Electrical Rough-In | 2/14/2019 | 2/15/2019 | 2/15/2019 | A | PASS |
James Ady
|
|
|
Listing inspection for solar panels and equipment; the roof top crew will be there from 8 to noon. Thanks guys Phone #: ###-#### Inspection requested via web by Ryan King Added to exhisting system listing ok
|
Final | 2/15/2019 | 2/15/2019 | 2/15/2019 | P | PASS |
James Ady
|
|
|
Listing inspection for solar panels and equipment; the roof top crew will be there from 8 to noon. Thanks guys Phone #: ###-#### Inspection requested via web by Ryan King Final ok
|