DOC - Permit Finaled | 7/12/2019 | 7/12/2019 | 7/12/2019 | P | PASS |
Eric Story
|
|
|
Project tacken over under permit ELE19-02488
|
Card not on site to sign | 4/26/2019 | 4/26/2019 | 4/26/2019 | P | CANC |
Eric Story
|
|
|
Need to have 100amp Main Electrical service signed off to authorize Idaho power to move the drop over to the new weatherhead/meter panel. Thank you. -Thomas Scheid (Electrician) Phone #: ###-#### Inspection requested via web by Thomas Scheid Needed ps
|
Permanent Service | 4/26/2019 | 4/26/2019 | 4/26/2019 | P | PASS |
Eric Story
|
|
|
Need to have 100amp Main Electrical service signed off to authorize Idaho power to move the drop over to the new weatherhead/meter panel. Thank you. -Thomas Scheid (Electrician) Phone #: ###-#### Inspection requested via web by Thomas Scheid p/s o/h rec ok
|
Conference | 4/2/2019 | 4/2/2019 | 4/2/2019 | P | DONE |
Eric Story
|
|
|
Would like to walk thru existing electrical service and get info on required changes to service drop, grounding, etc if the panel is replaced/upgrade. Phone #: ###-#### Inspection requested via web by Thomas Scheid Discussed service change options for exterior mounted main, Also discussed grounding with 2 ground rods being used as cannot conform water pipe is metal all the way underground.
|
Electrical Rough-In | 3/18/2019 | 3/18/2019 | 3/18/2019 | P | PASS |
Eric Story
|
|
|
Mike Phone #: ###-#### Correctins f ixed, whole house ok to cover
|
Electrical Rough-In | 3/14/2019 | 3/18/2019 | 3/18/2019 | A | NR |
Tom Saunders
|
|
|
Mike Phone #: ###-####... not ready...rescheduled to PM
|