Final | 5/24/2019 | 5/24/2019 | 5/24/2019 | P | PASS |
Rock A. Hudson
|
|
|
or all ###-#### Phone #: ###-#### Inspection requested via web by Robert Murray Final ok
|
Final | 5/23/2019 | 5/23/2019 | 5/23/2019 | P | NH |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Robert Murray House locked, called both numbers provided both no answer. Must recall
|
Final | 5/22/2019 | 5/22/2019 | 5/22/2019 | P | FAIL |
Rock A. Hudson
|
|
|
if no answer at above number call ###-#### Phone #: ###-#### Inspection requested via web by Robert Murray 314.16- Island receptacle box is an 8 cubic inch box with 11.25 cubic inch of conductor installed. 314.25- All boxes shall have covers. Microwave not trimmed.
|
Rough-In Permanent Service | 2/19/2019 | 2/20/2019 | 2/20/2019 | A | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### Inspection requested via web by Robert Murray rough-in p/s u/g n ok
|