Final | 6/19/2019 | 6/20/2019 | 6/20/2019 | P | PASS |
Mark Moncarr
|
|
|
Give me a heads up before you head over and I''ll make sure somebody''s there. Thank you. Phone #: ###-#### Inspection requested via web by David Kubik Ok final
|
Electrical Rough-In | 3/1/2019 | 3/1/2019 | 3/1/2019 | P | PASS |
Mark Moncarr
|
|
|
Cancelled p/s. Was supposed to be a RI for the basement. Ok cover basement.
|
Permanent Service | 2/28/2019 | 3/1/2019 | 3/1/2019 | P | CANC |
Mark Moncarr
|
|
|
Changed out a 6 space weatherproof panel on the outside by the meter to a bigger panel Phone #: ###-#### Inspection requested via web by David Kubik Should have been a RI for the basement.
|