Electrical Rough-In | 3/18/2019 | 3/19/2019 | 3/19/2019 | A | PASS |
Eric Story
|
|
|
Under ground and Equal potential inspection any questions please call Louis at ###-#### Phone #: ###-#### Inspection requested via web by Louis Keller EQ pool bond around perimeter of pool and power to pool panel ok to cover
|
Electrical Rough-In | 3/6/2019 | 3/7/2019 | 3/7/2019 | A | PASS |
Eric Story
|
|
|
Inspection for Bonding, Under ground and Water Bonding Any questions please call Louis at ###-#### Phone #: ###-#### Inspection requested via web by Louis Keller u/g and bonding of 4 corners and light,diving board,cover,and back to equipment ok to cover
|