Final | 9/27/2019 | 9/30/2019 | 9/30/2019 | A | PASS |
Mark Moncarr
|
|
|
Call Derek W/Aurora Power to schedule meeting time ###-#### Phone #: ###-#### Inspection requested via web by Alan Lusk Ok final. I finaled solar portion of job, but electrical was never called for a final. Breaker used was a 2 pole 40a on 200a panel.
|
Final | 9/27/2019 | 9/30/2019 | 9/27/2019 | A | CANC |
Mark Moncarr
|
|
|
Phone #: ###-#### >> Inspection requested via web by Alan Lusk Inspection cancelled from web by: Alan Lusk
|
Final | 9/27/2019 | 9/27/2019 | 9/27/2019 | P | CANC |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk Talked to Alan, going to coordinate with Aurora for final inspection.
|