Permit Information
Permit NumberELE19-00735
StatusFinaled
Name RED DOG ELECTRIC
Site Address 1702 N MOCKBEE PL
Project Name 
Customer Number0001
ePlanReviewNo
Description
Complete Installation (includes room count and per: Electrical Rough-in
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final12/10/201912/11/201912/11/2019PPASS
DetailsMark Moncarr
Please Contact Chris Majors at ###-#### to gain access to the house. Please give 30 minute notice prior to showing up to the house. Phone #: ###-#### Inspection requested via web by Noah Giver Ok final house. 2nd permit is pulled for living quarters off garage. ELE19-04735
Final7/29/20197/30/20197/30/2019APART
DetailsMark Moncarr
Partial final is for house only, not the B&B in basement. It is fine to move, I have already checked the house, 3/0 blank above mstr tub. A few small things to be fixed by electrician, he is going to notify me when done.
Electrical Rough-In7/29/20197/30/20197/30/2019APASS
DetailsMark Moncarr
Rough-in inspection for the basement B;B suite Phone #: ###-#### Inspection requested via web by Noah Giver Ok cover. Talked with electrician about a few outlets that may be required. Various areas may have lower cabinets put in place. It will affect outlet layout. These areas will need to be addressed for a final inspection.
Final7/29/20197/30/20197/30/2019ACANC
DetailsMark Moncarr
Final the main/second floor of the house. Phone #: ###-#### Inspection requested via web by Noah Giver Already gave partial final on 7/29. B&B is not part of final.
Final7/28/20197/29/20197/29/2019ANR
DetailsMark Moncarr
Phone #: ###-#### Inspection requested via web by Noah Giver Building still under review for lower level B&B. Already checked house out, if owners want to move in furniture thats fine, but a permit will have to be pulled for lower level before I can final home.
Final7/25/20197/26/20197/26/2019ANR
DetailsMark Moncarr
Phone #: ###-#### Inspection requested via web by Noah Giver Needing to get some answers from builder in various areas of house to complete installation.
Electrical Rough-In7/25/20197/26/20197/26/2019ACANC
DetailsMark Moncarr
Looking for rough-in inspection of the Air BnB suite in the basement of the house. Phone #: ###-#### Inspection requested via web by Noah Giver Need seperate permit
Electrical Rough-In4/26/20194/26/20194/26/2019PPASS
DetailsMark Moncarr
Soffit inspection for can light above single garage door. Phone #: ###-#### Inspection requested via web by Noah Giver Ok cover
Electrical Rough-In4/23/20194/23/20194/23/2019PPASS
DetailsMark Moncarr
Soffit inspection with firehats. Phone #: ###-#### Inspection requested via web by Noah Giver Ok cover 3 cans upper soffit, and 1 can above 2 car garage. Contractor is waiting for more fire hats to come in. Single car garage needs 1 fire hat installed. Will need another RI inspeciton.
Electrical Rough-In3/14/20193/15/20193/15/2019PPASS
DetailsMark Moncarr
Phone #: ###-#### Inspection requested via web by Noah Giver Ok cover inside only. Soffits will need another cover inspection after fire hats are installed for exterior cans. Space in basement E of garage is listed as unfinished.
Permanent Service3/15/20193/15/20193/15/2019PPASS
DetailsMark Moncarr
###-#### 2 ground rods. p/s u/g n ok