Final | 12/10/2019 | 12/11/2019 | 12/11/2019 | P | PASS |
Mark Moncarr
|
|
|
Please Contact Chris Majors at ###-#### to gain access to the house. Please give 30 minute notice prior to showing up to the house. Phone #: ###-#### Inspection requested via web by Noah Giver Ok final house. 2nd permit is pulled for living quarters off garage. ELE19-04735
|
Final | 7/29/2019 | 7/30/2019 | 7/30/2019 | A | PART |
Mark Moncarr
|
|
|
Partial final is for house only, not the B&B in basement. It is fine to move, I have already checked the house, 3/0 blank above mstr tub. A few small things to be fixed by electrician, he is going to notify me when done.
|
Electrical Rough-In | 7/29/2019 | 7/30/2019 | 7/30/2019 | A | PASS |
Mark Moncarr
|
|
|
Rough-in inspection for the basement B;B suite Phone #: ###-#### Inspection requested via web by Noah Giver Ok cover. Talked with electrician about a few outlets that may be required. Various areas may have lower cabinets put in place. It will affect outlet layout. These areas will need to be addressed for a final inspection.
|
Final | 7/29/2019 | 7/30/2019 | 7/30/2019 | A | CANC |
Mark Moncarr
|
|
|
Final the main/second floor of the house. Phone #: ###-#### Inspection requested via web by Noah Giver Already gave partial final on 7/29. B&B is not part of final.
|
Final | 7/28/2019 | 7/29/2019 | 7/29/2019 | A | NR |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Noah Giver Building still under review for lower level B&B. Already checked house out, if owners want to move in furniture thats fine, but a permit will have to be pulled for lower level before I can final home.
|
Final | 7/25/2019 | 7/26/2019 | 7/26/2019 | A | NR |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Noah Giver Needing to get some answers from builder in various areas of house to complete installation.
|
Electrical Rough-In | 7/25/2019 | 7/26/2019 | 7/26/2019 | A | CANC |
Mark Moncarr
|
|
|
Looking for rough-in inspection of the Air BnB suite in the basement of the house. Phone #: ###-#### Inspection requested via web by Noah Giver Need seperate permit
|
Electrical Rough-In | 4/26/2019 | 4/26/2019 | 4/26/2019 | P | PASS |
Mark Moncarr
|
|
|
Soffit inspection for can light above single garage door. Phone #: ###-#### Inspection requested via web by Noah Giver Ok cover
|
Electrical Rough-In | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | PASS |
Mark Moncarr
|
|
|
Soffit inspection with firehats. Phone #: ###-#### Inspection requested via web by Noah Giver Ok cover 3 cans upper soffit, and 1 can above 2 car garage. Contractor is waiting for more fire hats to come in. Single car garage needs 1 fire hat installed. Will need another RI inspeciton.
|
Electrical Rough-In | 3/14/2019 | 3/15/2019 | 3/15/2019 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Noah Giver Ok cover inside only. Soffits will need another cover inspection after fire hats are installed for exterior cans. Space in basement E of garage is listed as unfinished.
|
Permanent Service | 3/15/2019 | 3/15/2019 | 3/15/2019 | P | PASS |
Mark Moncarr
|
|
|
###-#### 2 ground rods. p/s u/g n ok
|