Final | 3/14/2019 | 3/15/2019 | 3/15/2019 | P | PASS |
Mark Moncarr
|
|
|
Vents are being sealed. Call David with estimated time of arrival so he can coordinate with Idaho Power for access. Phone #: ###-#### Inspection requested via web by Tod Lane Ok final. Vents on the front left protion of paint booth were sealed on the inside with a piece of sheetmetal, screwed and caulked along all edges. I requested to be emailed literature on the explosion proof paint compressors, and also a letter stating that only waterbase paint will be used for all future applications. Exhaust fan, nor the opening of doors, does not function directly with paint spray guns. Spray guns will continue to operate.
|
Final | 3/12/2019 | 3/13/2019 | 3/13/2019 | P | FAIL |
Mark Moncarr
|
|
|
New power for paint booth heater. Inside transformer test building. Call David Forbes for access to Idaho Power. Phone #: ###-#### Inspection requested via web by Tod Lane As per article 516 of NEC, any possible ignition point within 3 ft of paint booth opening makes the area a classified location. 4 vent openings to the left of the left door need to be sealed to eliminate hazardous location classification.
|
Final | 3/8/2019 | 3/8/2019 | 3/8/2019 | P | CANC |
Mark Moncarr
|
|
|
New power for paint booth heater. Inside transformer test building. Call David Forbes for access to Idaho Power. Phone #: ###-#### >> Inspection requested via web by Tod Lane Inspection cancelled from web by: Tod Lane
|