Final | 7/5/2019 | 7/8/2019 | 7/8/2019 | A | PASS |
Mark Moncarr
|
|
|
Josh Phone #: ###-#### Ok final. Corrections made.
|
Final | 7/3/2019 | 7/5/2019 | 7/5/2019 | A | FAIL |
Mark Moncarr
|
|
|
Josh Phone #: ###-#### 1. GFI island 2. ARC fault brkrs for beds 3. Cover plates for 3 out WP's 4. Lockouts for hood, oven, and micro 5. Recept need within 6ft to left of pocket door in mstr. 6. Label garage brkr in meter main.
|
Electrical Rough-In | 4/11/2019 | 4/12/2019 | 4/12/2019 | A | PASS |
Mark Moncarr
|
|
|
Josh Phone #: ###-#### Ok cover living, kitchen and new addition E side.
|
Electrical Rough-In | 3/26/2019 | 3/27/2019 | 3/27/2019 | A | PASS |
Mark Moncarr
|
|
|
underground for garage // Josh Phone #: ###-#### Ok cover conduit between house and garage. It is to depth per code. A short section by garage will not be as deep. Conduit run will be covered by concrete walkway.
|
Electrical Rough-In | 3/19/2019 | 3/20/2019 | 3/20/2019 | A | CANC |
Mark Moncarr
|
|
|
Josh Phone #: ###-#### No RI inspection at this time.
|
Permanent Service | 3/11/2019 | 3/12/2019 | 3/11/2019 | A | PASS |
Mark Moncarr
|
|
|
No RI. Forgot to cancel RI inspection and change to a permanent service. p/s o/h n ok
|
Electrical Rough-In | 3/7/2019 | 3/11/2019 | 3/11/2019 | A | PASS |
Mark Moncarr
|
|
|
Josh Phone #: ###-#### p/s o/h n ok
|
Conference | 3/5/2019 | 3/6/2019 | 3/6/2019 | A | DONE |
Mark Moncarr
|
|
|
Joshua Phone #: ###-#### Discussed moving service to S side of house to allow for a mstr suite addition. 50a temp power to existing service location will need to be GFI protected.
|