Final | 1/19/2020 | 1/21/2020 | 1/21/2020 | P | PASS |
James Ady
|
|
|
Requesting a final electrical inspection. Please call my cell about 30 minutes before inspection so I can get home from work. Phone #: ###-#### Inspection requested via web by Mike Quinn final
|
Electrical Rough-In | 11/8/2019 | 11/8/2019 | 11/8/2019 | P | PASS |
James Ady
|
|
|
Finished wiring up the switch boxes and connected the additional master bathroom outlet, both ready for inspection. Please call my phone and let me know the tentative time for inspection. Phone #: ###-#### Inspection requested via web by Mike Quinn Rough in ok
|
Electrical Rough-In | 11/3/2019 | 11/4/2019 | 11/4/2019 | A | PASS |
James Ady
|
|
|
RI inspection for the remainder of the remodel. Looking to drywall the week of 11/11. Please call my cell before heading to the house. I''ll be at work all morning but can be home in about 15 minutes. Phone #: ###-#### Inspection requested via web by Mike Quinn Master bed, closet and bath
|
Electrical Rough-In | 8/11/2019 | 8/12/2019 | 8/12/2019 | P | PART |
James Ady
|
|
|
Rough-in inspection for new bathroom, laundry area, and existing bedrooms. Would be preferable if inspection could be around either Noon or 4pm. Phone #: ###-#### Inspection requested via web by Mike Quinn Hall bath, Hall, and laundry area only ok to cover, (this is partial only. Master bed, closet and Master bath not ready)
|
Conference | 3/7/2019 | 3/11/2019 | 3/11/2019 | P | PASS |
James Ady
|
|
|
after 3:30 please- Mike Phone #: ###-#### Owner has done several projects before. Turning Addition area into a masterbed/bath, Talked about afci protection of bedroom. 20amp circuit for vanity recep. Smoke detectors. Tamper resistant receps.
|