Final | 7/11/2019 | 7/15/2019 | 7/15/2019 | A | PASS |
Eric Story
|
|
|
Ready for final inspection. Home will be open and electricians should also be at home. Thank you Phone #: ###-#### Inspection requested via web by Paula Gratiot Final ok
|
Rough-In Permanent Service | 3/26/2019 | 3/26/2019 | 3/26/2019 | P | CANC |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Paula Gratiot Wrong inspection called in
|
Electrical Rough-In | 3/13/2019 | 3/13/2019 | 3/13/2019 | P | PASS |
Eric Story
|
|
|
Builder will be on site from 12-2:00...he will leave the door unlocked after 2:00...if no answer, OK to enter, go upstairs, rooms are to the left on the upper level. Construction materials are clearly visible. Homeowner should be present after 2:00 (Balukoff residence). Phone #: ###-#### Inspection requested via web by Paula Gratiot Upstairs room combination ok to cover
|
Electrical Rough-In | 3/12/2019 | 3/13/2019 | 3/13/2019 | A | NH |
Eric Story
|
|
|
inspection for electrical of remodel of 2 existing room into 1 large room. Someone should be on site to let inspector in. Phone #: ###-#### Inspection requested via web by Paula Gratiot No body home
|