Final | 5/7/2020 | 5/8/2020 | 5/8/2020 | A | PASS |
Tom Saunders
|
|
|
*screened* Interior, virtual inspection requested - Nicole Phone #: ###-####... ok to final..inspection done by images as per COVID19 requirements
|
ELE-Request for Extension | 12/16/2019 | 12/16/2019 | 12/16/2019 | A | PASS |
Daryl DeGrange
|
|
|
Request for permit extension approved for additional 180 days
|
Electrical Rough-In | 6/11/2019 | 6/12/2019 | 6/12/2019 | A | PASS |
Tom Saunders
|
|
|
Nicole (wife) Phone #: ###-####.... rough ok to cover...corrections made
|
Electrical Rough-In | 5/13/2019 | 5/16/2019 | 5/16/2019 | A | FAIL |
Mark Moncarr
|
|
|
Nicole Phone #: ###-#### 1. Ground screw needed for metal box. 2 Seperate #12 from #14 wires. 3. I didnt see box buried in wall on first inspection. Homeowner informed me there was a remodel prior to them buying home. There was another wire tucked between some studs. May be hot. 3. Box to be cut in in kitchen cabinet on opposite wall and install a blank plate.
|
Electrical Rough-In | 5/9/2019 | 5/10/2019 | 5/10/2019 | A | FAIL |
Mark Moncarr
|
|
|
Nicole (homeowner)-please go out after 9:30 am-frame insp is PM Phone #: ###-#### 1. 1/2" connectors needed in can light and fan. 2. Changed out metal junction box to a larger cubic inch box to allow for box fill. 3. All wires need to be stapled within 8" of box it enters.
|
Final | 3/14/2019 | 3/18/2019 | 3/18/2019 | A | CANC |
Tom Saunders
|
|
|
Nicole Phone #: ###-####...homeowner need conference instead
|
Conference | 3/18/2019 | 3/18/2019 | 3/18/2019 | A | PASS |
Tom Saunders
|
|
|
Nicole Phone #: ###-####... discussed the wiring to add toilet and shower in downstairs utillity rm...access to junction boxes, required damp location light, and placement of exhaust fan. GFI protection outlet within 6ft of sink
|