Final | 3/26/2019 | 3/26/2019 | 3/26/2019 | P | PASS |
Mark Moncarr
|
|
|
Please final out permit Phone #: ###-#### Inspection requested via web by Kendra Lanham Ok final. OSB was used to protect SER on left side of panel. A permanent trim ring is to be installed around meter base.
|
Permanent Service | 3/21/2019 | 3/22/2019 | 3/22/2019 | A | PASS |
Mark Moncarr
|
|
|
Idaho Power is turning off power now. We are removing old meter pack and replacing with new. Units 111 ; 112 (Chateau Park Apartments) Phone #: ###-#### Inspection requested via web by Kendra Lanham Service already energized. To left of meter main, a 4x20" piece of OSB installed to protect protect conductors. A permanent trim piece around meter is to be installed.
|