Final | 8/12/2019 | 8/12/2019 | 8/12/2019 | A | PASS |
Eric Story
|
|
|
Ready for final. If building is not open nox box code is 1709 , located to back of building Phone #: ###-#### Inspection requested via web by Kurt Carlson Occ card signed Final ok
|
Permanent Service | 5/16/2019 | 5/17/2019 | 5/17/2019 | P | PASS |
Mark Moncarr
|
|
|
Idaho Power to turn off power, existing service removed ,new multi metering and termination cabinet to be installed. Service to be inspected, so Idaho Power can turn back on before the end of Friday. Should be ready for inspection around 1:30 ish Phone #: ###-#### Inspection requested via web by Kurt Carlson p/s u/g n ok
|
Electrical Rough-In | 5/7/2019 | 5/7/2019 | 5/7/2019 | P | PASS |
Mark Moncarr
|
|
|
Rough in Phone #: ###-#### Inspection requested via web by Kurt Carlson Ok cover core and shell. 2 permits on job, 1 for TI, and the other for the core and shell. Was there this morning to do TI RI.
|