Final | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | PASS |
James Ady
|
|
|
Swimming pool final. Access granted through construction entrance at southeast corner of residence. Phone #: ###-#### Inspection requested via web by Lars Johnson final ok
|
Electrical Rough-In | 6/4/2019 | 6/5/2019 | 6/5/2019 | A | PASS |
James Ady
|
|
|
EQ bonding for swimming pool Phone #: ###-#### Inspection requested via web by Lars Johnson eq bond only ok to cover
|
Electrical Rough-In | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | PASS |
Rock A. Hudson
|
|
|
Underground and bonding for swimming pool. Access granted at South East corner of residence where trenching was done Phone #: ###-#### Inspection requested via web by Lars Johnson Under ground from equipment to pool and spa. Bonds for all 4 corners, each end of pool cover, and from shell to equipment rough in ok cover.
|