Electrical Rough-In | 4/11/2019 | 4/12/2019 | 4/12/2019 | P | PASS |
Mark Moncarr
|
|
|
The general on the job put a pre-connected heating pad for tile floor in and needs inspection before he can put the tile in please call with any questions thanks! Phone #: ###-#### Inspection requested via web by Trevor Soesbe Ok cover flr heat mstr.
|