Final | 7/9/2019 | 7/9/2019 | 7/9/2019 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Shane Lott Final ok
|
Electrical Rough-In | 5/17/2019 | 5/17/2019 | 5/17/2019 | P | PASS |
Mark Moncarr
|
|
|
Cover inspection at new entryway Phone #: ###-#### Inspection requested via web by Shane Lott Ok cover inside entry W side.
|
Electrical Rough-In | 4/30/2019 | 4/30/2019 | 4/30/2019 | P | PASS |
Mark Moncarr
|
|
|
Wall rough in floral Phone #: ###-#### Inspection requested via web by Shane Lott Ok cover single outlet in new floral location.
|
Electrical Rough-In | 4/16/2019 | 4/16/2019 | 4/16/2019 | P | PASS |
Mark Moncarr
|
|
|
rough in for immunization room by the pharmacy call cody for questions ###-#### Phone #: ###-#### Inspection requested via web by Shane Lott Ok cover.
|
Electrical Rough-In | 4/15/2019 | 4/15/2019 | 4/15/2019 | P | PASS |
Mark Moncarr
|
|
|
ROUGHIN FOR FLORAL AREA call cody ###-#### for questions Phone #: ###-#### Inspection requested via web by Shane Lott Ok cover 3 conduits to feed new cashier location.
|