Final | 6/20/2019 | 6/21/2019 | 6/21/2019 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Ryan Wilson Ok final. During the RI stage on properties 2101, 2103, 2107, and 2113 power was run from the detached garage to the sides of the homes. Fused power entered a 12x12 pvc junction box. No disc. I realize 225.32 states that a disc means needs to be provided. This was something that I misinterpreted. There is a main brkr at the service location for the panels that are installed in the homes. All terminations, fittings and boxes follow NEC requirements. Junction boxes on 2 of the structures are located directly below 3 large dining windows. Would be hard to move. The other 2 would lack a majority of the working clearance needed. These are the only 4 structures that I have inspected that have this type of installation. I did let the contractor and builder know that for future work like this, 225.32 would need to be followed. There is No life safety issues with this installation.
|
Rough-In Permanent Service | 4/15/2019 | 4/16/2019 | 4/16/2019 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Ryan Wilson Back exterior outlet needed upon final. p/s o/h n ok
|